成都地铁18号线1~4期站点与规划来了,看看有你家门口吗?

分秒必看娱乐 2024-11-16 04:04:32

阅读此文之前,麻烦您点击一下“关注”,既方便您进行讨论和分享,又能给您带来不一样的参与感,感谢您的支持!

__Based on the content, I‘ll analyze the key information about Chengdu Metro Line 18:

Key Facts:

Route Coverage:

Phase 1-2: South Railway Station to Tianfu Airport North

Phase 3: North Railway Station extension including stations at:

North Railway Station

Luomashi Station

Provincial Stadium Station

Nijia Bridge Station

Additional stations: Airport North Station and Linjiang Station

Phase 4: Extension to Jianyang South Station

Current Status:

Phases 1-2: Operational

Phase 3: Under construction, expected completion by end of 2025

Phase 4: Planned

Major Interchange Points:

Connects with Lines 1, 6, 7, and 9

Tianfu Station (transfer only, no entry比exit)

Integration with S3 line and Line 19 for Jianyang access

Significance:

Improves airport accessibility

Connects major transportation hubs

Facilitates Chengdu-Jianyang integration

Enhances commuting options

Challenges:

Complex construction at North Railway Station

Concurrent high-speed rail construction

Operating around existing metro lines

Managing urban development impact

The article is written in a conversational Sichuan dialect style, using local expressions and emphasizing the practical benefits for residents, particularly focusing on improved connectivity between Chengdu and Jianyang. It also discusses potential impacts on property values while maintaining an optimistic tone about regional development.

Would you like me to elaborate on any particular aspect of the analysis?

【免责声明】文章描述过程、图片都来源于网络,此文章旨在倡导社会正能量,无低俗等不良引导。如涉及版权或者人物侵权问题,请及时联系我们,我们将第一时间删除内容!如有事件存疑部分,联系后即刻删除或作出更改。

0 阅读:0